Start Predictive Maintenance AI With a Quarter of Downtime Logs

Log a quarter of maintenance downtime by machine, then test your first predictive maintenance model on the costliest machine for a second quarter.

By Jenna de Beer, Forward Deployed Engineer, Nine-67 · · 3 min read

Start predictive maintenance AI with a log: one quarter of maintenance downtime, machine by machine. Put the first model on the machine whose sensor-detectable failures cost the most, and score its alerts for a second quarter before they become planned jobs.

How NIST measured maintenance downtime

A June 2020 NIST report defines predictive maintenance as maintenance initiated based on predictions of failure made using observed data such as temperature, noise, and vibration. Its Machinery Maintenance Survey asked maintenance managers at US discrete manufacturers to estimate, for 2016, how much planned production time was lost to unplanned maintenance and repair. This article calls that maintenance downtime.

In the 2020 report and its journal version, the 25 percent of plants that relied most on reactive maintenance, meaning repairs made after a machine fails, lost, on average, 6.7 percent of planned production time to maintenance downtime. The 25 percent that relied least on it lost 0.9 percent. That second group relied more on preventive and predictive maintenance.

NIST also notes that many firms do not formally track this downtime. That is where the work starts.

Log a quarter of downtime by machine

For a 13-week quarter, have the maintenance manager close every unplanned work order with the machine, the hours it stood, whether a maintenance issue caused it and which part failed. The plant controller divides each machine's maintenance downtime by its planned production hours.

The controller then prices those hours. Use the cost of idle energy, labor and capital, as NIST does, or the lost order's contribution margin where that is larger. Add expediting costs and penalties on late orders, with the production planner tying each one to its stop.

Which machine should get the first model?

NIST says predictive maintenance usually requires a larger upfront investment than preventive maintenance. So fund one model first, on the machine whose sensor-detectable failures cost the most, as the maintenance manager judges them. Agree a fixed fee for a stated term. Hardware and fitting are paid upfront and capitalized, meaning recorded as an asset. Software and training are paid from the maintenance budget once the model passes a second-quarter test. The plant keeps the hardware, the model and the data.

Test the model for a second quarter

The second quarter is the test. It runs 13 weeks from a start date written into the fee, longer if too few maintenance stops occur. The plant manager writes the pass marks into the fee. The machine keeps its normal maintenance schedule. Each time the model raises an alert, a technician checks the machine within the shift and repairs at once anything unsafe.

The controller counts alerts whose named fault was confirmed within a window the maintenance manager sets, alerts that nothing confirmed, and maintenance stops that no alert predicted. If the model misses any pass mark, the plant manager switches it off.

From the third quarter, the maintenance manager turns alerts into planned jobs and drops scheduled tasks they duplicate. Each quarter the controller adds up the machine's maintenance spend, its share of the fee and the cost of planned and unplanned stops, per planned production hour. Fund the next costliest machine when that cost falls below the second quarter's, which included no software fee. Each machine then joins on evidence from the one before it.

Sources

  1. nvlpubs.nist.gov: initiated based on predictions of failure made using observed data such as temperature, noise, and vibration
  2. nist.gov: journal version

See what we would build for your business. Book a meeting

About the author. Jenna de Beer is a Forward Deployed Engineer at Nine-67. Connect on LinkedIn